We are ProWelders

Transforming
With Innovations

If you are searching for quality and highly efficient Welding Services, you have come to the right place.
From pre-fabrication to finishing, ProWelders can keep your fabrication project in house, eliminating the need for subcontracting work out to other companies, putting a strain on your budget and your timelines.
Our team and facilities are equipped to handle all your needs within our footprint. Conveniently located near major transportation hubs, ProWelders can utilize a combination of truck, air, rail, or ship to transport your metal fabrication project from ProWelders to its destination.
0+

Years of Experience

0

Companies Served

0

Satisfied Customers

Well Maintained

We can Maintain every facet of your structural steel project. From the purchase of materials to the design and delivery of complete assemblies.

24/7 Service

24x7 service has resolved thousands of customer’s Welding related problems with high success rate and customer satisfaction Levels.

Latest Equipments

Latest Equipments with with Latest Technology is helps to complete the projects are on time If projects are completed on time.

Safety Commitment

Your employees learn by example. If they don't see you practicing good safety habits, they won't think safety is
important.
We are ProWelders

Professional Profile

I am an experienced coded pipe welder & Fabricator in oil & gas industry, Boiler tubes, Dairy , mining, wine and shipping industry, Tanks and Steel structures. I have an eye for detail and have more than 25 yrs experience. I have extensive technical ability and able to operate a wide range of power tools have workshop and site experience. I am an experienced shift worker with unlimited availability, also available for remote location positions. I work well under pressure and always meet strict deadlines in this fast-paced environment. I relate well to people from diverse cultural backgrounds. I am extremely safety conscious and abide strictly to all Workplace Health and Safety Regulations. I have my own reliable transport and tools and equipment.
  • Excellent welding and pipe fabrication ability
  • Excellent and extensive technical ability
  • Exceptional time management skills
  • Proven organisational & problem-solving skills
  • Excellent interpersonal skills
  • Strong team player with the ability to work unsupervised
  • Good written and verbal communication skills

Johnny H Goliath

We are ProWelders

Our Services

For Quality Welding Services Contact Us

We always bring good quality services with 100% safety measures
We are ProWelders

Our Recent Projects

  • Coded Pipe Welder/Fabricator/Structural Welder/ Fabricator
    Company : WRIGHTWAYCONSTRUCTION / YEALANDS WINERY/ CMP/ IMG GLEN BROOKE STEEL MILL -COMMERCIAL BAY/ENERGYWORKS -METHANEX /IMG- KINLEGHT
    Date: August 2017 – March 2020
    Standards used: ASME IX ,GTAW TIG,SMAW STICK,FCAW FLUXCORE
    Duties performed :
    • WRIGHTWAY CONSRUCTION: Weld and Fab 2”-8’’ pipes in workshop & install onsite for JJ Richards and fit inlets and outlets Stubs on S/Steel tanks.
    • YEALANDS WINERY: Install 2”-6” pipes,tanks & welding & fabrication service legs & pipe supports
    • TRADESTAFF- COMMERCIAL BAY :Welding & Fabricating support beams for concreting floor in foundation & modify carbon steel pipes for concrete pumping .
    • ENERGYWORKS-Methanex shutdown:Replacing 36”S/Steel reducer on pressure vessel. Installing S/Steel pressure vessel with 4 12” inlets stubs & 4 12”outlets stubs
    • Installing S/Steel pressure vessel
    • Welding and fabrication
    • IMG-KINLEIGHT: Replacing 4”-6” carbon steel pipes on existing lines repairing & Replacing cracks on kiln. Installing new platforms &handrails.
  • Coded Pipe Welder/Fabricator
    Company: NEWCO ENGINEERING
    Date: March 2017 – May 2017 (contract)
    Standards used: ASME IX ,GTAW TIG
    Duties performed :
    • Welding Fabricating 2”-6”pipes & pipe supports & installing tanks for Midfield & Dreyfus Dairy Plant in Penola
  • Coded Pipe Welder/ Fabricator
    Company: IMG GLENBROOK/TP ENGINEERING/McCONNELL & DOWELL
    Date: May 2013 - March 2017
    Standards used: ASME IX ,GTAW 6G ,SMAW Stick
    Duties performed:
    • IMG: GLENBROOK STEEL MILL Working 1,2,3,4 day shutdowns plant maintenance replacing beams, pipes , stairs ,handrails & platforms
    • TP ENGINEERING:Building new gas plant BOC in Glenbrook fabricate & Weld 1”- 36”S/Steel , carbon steel & alloy pipes and plates & install on site.
    • McCONNELL&DOWELL: Working in Water view Tunnel on TBM while drilling and preparing for turn around to drill next tunnel after completion of drilling cut up and send TBM to China. Working with electricians for 1 year installing cables ,cable trays lights, cameras, speakers ,installing traffic signs and street lights outside tunnel.
  • Structural Steel Welder/ Fabricator
    Company: STEVE CLARK ENGINEERING/ D & H STEEL CONSTRUCTION
    Date; Dec 2012 – May 2013
    Standards used: ASME IX FCAW Flux core GMAW Mig
    Duties performed:
    • STEVE CLARK ENGINEERING:Fabricate Steel structure , House steel Frames ,road steel frames car ports & general engineering .
    • D & H STEEL CONSTRUCTION: Welding and fabrication special I Beam for Christchurch earth quake repairs. Welding and fabricating steel structures for up coming buildings in Auckland.
  • Coded Pipe Welder
    Company: ERD FABRICATORS – BABCOCK AFRICA / GRINAKER LTA CONSTRUCTION / TRADE FLUX PETRO CHEMICAL PLANT / SA FIVE ENG
    Date: September 2001 - August 2005
    Standards used: ASME IX,GTAW TIG,SMAW STICK ,FCAW FLUX CORE ,6GR
    Duties performed:
    • ERD - BABCOCK AFRICA Building new power stations ,rebuilding boilers & repairing boilers , maintaining all boilers across Africa including shutdowns.
    • GRINAKER LTA : Fabricating & Welding 2’’ – 18” pipes & tanks in copper mines & plant maintenance .
    • TRADE FLUX PETRO - MOSS GAS Welding & Fabricating S/Steel pipes ,carbon steel ,duplex & chrome moly 2”-18”
    • SA FIVE ENG - BLUE WATERS : Modify vessel into refinery fabricating & welding 2’’ – 18 “pipes carbon steel ,S/Steel ,duplex & chrome moly , Fabricating flair boom & supports 18”- 16” 6GR position.
  • Coded Pipe Welder/Fabricator
    Company: HYDRA ARG SASOL 2&3 PETROL REFINERY / GAF MARINESHIP REPAIRS / ROWLEY MORGAN WORKSHOP .
    Date: 1985 - August 2001
    Standards used: ASME IX,GTAW TIG,SMAW STICK, FCAW FLUX CORE GMAW MIG
    Duties performed and equipment used;
    • HYDRA ARC : Repairing & Replacing 2’’ – 36” pipelines carbon steel S/Steel & chrome moly, replacing pressure vessels & plant maintenance on Sasol 2&3
    • GAF MARINE: Fabricating & Welding doing ship repairs on decks ,engine rooms of vessels, fabricating new harbor cranes and barges.
    • ROWLEY MORGAN: Fabricating &Welding Harbor cranes ,barges ,& all types of heavy engineering.